~CLPRD
~CLPRD, DIRKEY, MCTOP, MCBOT, RNFMAT, KFILL, Matrix, PHITOP, PHIBOT, TYP
Pre designs concrete rectangular sections for the selected elements
POST1: Concrete Checking
DIRKEY
Key identifying the bending plane
|
0 |
Moment Mz (XY plane) |
|
1 |
Moment My (XZ plane) |
MCTOP
Mechanical cover at top
MCBOT
Mechanical cover at bottom
RNFMAT
Reinforcing steel material
KFILL
Key identifying the command action:
|
0 |
Fill up the array (MATRIX) defined in the next argument of the command. |
|
1 |
Fill up the array and introduce the obtained reinforcement amount in the cross sections of the selected elements. This amount is introduced as scalable reinforcement. These reinforcement values can be used as input value to the design process according to the active code. |
|
2 |
Fill up the array and introduce the obtained reinforcement amount in the cross sections of the selected elements. This amount is introduced as fixed reinforcement. These reinforcement values can be used as input value to the design process according to the active code. |
Matrix
The name of the created array that. This array is dimensioned as MATRIX(14, NSEL), where NSEL is the maximum number of the selected elements.
|
MATRIX (1, J) |
Number of element |
||||||||||||
|
MATRIX (2, J) |
Indicates the end type in the element
|
||||||||||||
|
MATRIX (3, J) |
Envelop of bottom reinforcement |
||||||||||||
|
MATRIX (4, J) |
Envelop of top reinforcement |
||||||||||||
|
MATRIX (5, J) |
Necessary reinforcement amount at bottom |
||||||||||||
|
MATRIX (6, J) |
Necessary reinforcement amount at top |
||||||||||||
|
MATRIX (7, J) |
Minimum geometrical reinforcement amount at bottom |
||||||||||||
|
MATRIX (8, J) |
Minimum geometrical reinforcement amount at top |
||||||||||||
|
MATRIX (9, J) |
Minimum mechanical reinforcement amount at bottom |
||||||||||||
|
MATRIX (10, J) |
Minimum mechanical reinforcement amount at top |
||||||||||||
|
MATRIX (11, J) |
Section situation with respect to the solicitation:
|
||||||||||||
|
MATRIX (12, J) |
Condition that designs the bottom reinforcement:
|
||||||||||||
|
MATRIX (13, J) |
Condition that designs the top reinforcement:
|
||||||||||||
|
MATRIX (14, J) |
Position of the more tensioned or less compressed fiber
|
FITOP
Bar diameter in millimeters at top location. If this argument is left blank or zero, the reinforcement will be considered as linearly distributed. This field is valid only if KFILL = 1 or 2.
FIBOT
Bar diameter in millimeters at bottom location. If this argument is left blank or zero, the reinforcement will be considered as linearly distributed. This field is valid only if KFILL = 1 or 2.
TYP
Section type for the reinforcement minimum amount calculation
|
0 |
Beams (default value) |
|
1 |
Columns |
|
2 |
Slab |
|
3 |
Wall (horizontal reinforcement) |
|
4 |
Wall (vertical reinforcement) |
Notes
- The reinforcement amount placed in each cross section corresponds to the largest amount calculated for all the elements that compose the section.
- The obtained reinforcement is an estimate value and it does not depend on the active code.
Menu Path
Main Menu > Civil Postprocessor > PreDesign > Model Predesign