CFVR0812 - Combination module test
Example to check the combinations utility
This example checks the functionality of the combinations module.
It checks the following:
- Results handle on BEAM54 elements.
- Date handle with unsorted numeration (elements, load steps...)
The load cases are:
- Load Step 2, Sub Step 1, Time 10: Surface load (1 N/m) on Span 1.
- Load Step 3, Sub Step 3, Time 30: Surface load (2 N/m) on Span 2.
- Load Step 6, Sub Step 2, Time 50: Surface load (3 N/m) on Span 3.
The targets for the combinations are:
- Target 12: Absolute value MZ.
- Target 23: Minimum value SBYT.
- Target 25: Maximum value EPEL DIR
- Target 30: Minimum value COMBS YBZM
- Target 35: Minimum value COMBEPEL YBZM
- Combination rule 18: Select with variable coefficientes [(2.0 or 3.0)*H1+(1.0 or 2.0)*H2+(1.0 or 1.0)*H4]
Element types used in the model: BEAM54 Needed CivilFEM Modules: |
|
| Model Statistics | |
| Number of elements | 6 |
| Number of nodes | 12 |
| Number of civil materials | 0 |
| Number of cross sections | 0 |
| Number of shell vertices | 0 |
Log file: CFVR0812.DAT
FINISH ~CFCLEAR,,1 AnsLic='ansys' NomFile='CFVR0812' /TITLE, %NomFile%, Combination module test with BEAM54 ! --------------------------------------------------------------------------------- ! Model definition and solve ! --------------------------------------------------------------------------------- ! Load scheme: ! LS2 SB1 TM10 Q=1 LS3 SB3 TM30 Q=2 LS6 SB2 TM50 Q=3 ! |||||||||||||||||| ||||||||||||||||| ||||||||||||||||||| ! |||||||||||||||||| ||||||||||||||||| ||||||||||||||||||| ! vvvvvvvvvvvvvvvvvv vvvvvvvvvvvvvvvvv vvvvvvvvvvvvvvvvvvv ! 2 4 6 8 10 12 14 : Nodes LS8 ! o=========o=========o=========o=========o=========o=========o ------> N=100 SB1 ! ^ 5 7 ^ 9 11 ^ 13 15 ^ : Elements ! 3 5 7 9 11 13 : Material ! 2 4 6 8 10 12 : Section ! 4 4 6 6 8 8 : Type ! |------ 10 m -------|------ 16 m -------|------ 10 m -------| ! --------------------------------------------------------------------------------- /PREP7 ! Materials *DO,IMAT,2,14 MP,EX,IMAT,3E6 MP,NUXY,IMAT,0.2 *ENDDO ! Sections H=2 A=2 IZ=1/12*1*2**3 *GET,VERSION,ACTIVE,,REV *IF,VERSION,GE,22.2,THEN *DO,ISEC,1,4 R,ISEC,A,IZ,H *ENDDO *DO,ISEC,9,13 R,ISEC,A,IZ,H *ENDDO *DO,ISEC,5,8 R,ISEC,A,IZ,H *ENDDO ! Element types ET,1,BEAM3 *DO,ITYP,2,10,4 ET,ITYP,BEAM3 *ENDDO *DO,ITYP,4,12,4 ET,ITYP,BEAM3 *ENDDO *ELSE *DO,ISEC,1,4 R,ISEC,A,IZ,H/2,H/2,A,IZ RMORE,H/2,H/2 *ENDDO *DO,ISEC,9,13 R,ISEC,A,IZ,H/2,H/2,A,IZ RMORE,H/2,H/2 *ENDDO *DO,ISEC,5,8 R,ISEC,A,IZ,H/2,H/2,A,IZ RMORE,H/2,H/2 *ENDDO ! Element types ET,1,BEAM54 *DO,ITYP,2,10,4 ET,ITYP,BEAM54 *ENDDO *DO,ITYP,4,12,4 ET,ITYP,BEAM54 *ENDDO *ENDIF ! Nodes N, 1,-1 N, 2, 0 N, 4, 5 N, 6,10 N,10,26 FILL,6,10 N,14,36 FILL,10,14 ! Elements MAT, 3 $ REAL, 2 $ TYPE, 4 $ EN, 5, 2, 4 MAT, 5 $ REAL, 4 $ TYPE, 4 $ EN, 7, 4, 6 MAT, 7 $ REAL, 6 $ TYPE, 6 $ EN, 9, 6, 8 MAT, 9 $ REAL, 8 $ TYPE, 6 $ EN,11, 8,10 MAT,11 $ REAL,10 $ TYPE, 8 $ EN,13,10,12 MAT,13 $ REAL,12 $ TYPE, 8 $ EN,15,12,14 ! Boundary conditions D,2,UX D,2,UY $ D,6,UY $ D,10,UY $ D,14,UY ! Plot /ESHAPE,1 EPLOT ! Initial hypothesis solve /SOLU SOLCONTROL,OFF AUTOTS,OFF ! Hypothesis 0: LS1 Ignored TIME, 2 OUTRES,ALL,NONE SOLVE ! Hypothesis 1: LS2 SB1 TM10 Q=1 (1st Span) /TITLE, H1: LS2 SB1 TM10 Q=1 (1st Span) TIME,10 OUTRES,ALL,ALL SFBEAM, 5,1,PRES,1,1 SFBEAM, 7,1,PRES,1,1 SOLVE SFEDELE,ALL,ALL,PRES ! Hypothesis 2: LS3 SB3 TM30 Q=2 (2nd Span) /TITLE, H2: LS3 SB3 TM30 Q=2 (2nd Span) TIME,30 NSUBST,3 OUTRES,ALL,LAST SFBEAM, 9,1,PRES,2,2 SFBEAM,11,1,PRES,2,2 SOLVE SFEDELE,ALL,ALL,PRES ! Hypothesis 0: LS4 Ignored TIME,31 OUTRES,ALL,NONE SOLVE ! Hypothesis 0: LS5 Ignored TIME,32 OUTRES,ALL,NONE SOLVE ! Hypothesis 3: LS6 SB2 TM50 Q=3 (3rd Span) /TITLE, H3: LS6 SB2 TM50 Q=3 (3rd Span) TIME,50 NSUBST,2 OUTRES,ALL,ALL SFBEAM,13,1,PRES,3,3 SFBEAM,15,1,PRES,3,3 SOLVE SFEDELE,ALL,ALL,PRES ! Hypothesis 0: LS6 Ignored TIME,52 OUTRES,ALL,NONE SOLVE ! Hypothesis 4: LS8 SB1 TM60 N=100 /TITLE, H4: LS8 SB1 TM60 N=100 TIME,60 NSUBST,1 OUTRES,ALL,ALL F,14,FX,100 SOLVE FDELE,ALL,ALL /POST1 ! --------------------------------------------------------------------------------- ! Definition and solving of combinations ! --------------------------------------------------------------------------------- ! Reset combinations module ~CMBCLR, ! Targets definition ~TRGDEF,12,BEAM,M ,Z ,ABS ~TRGDEF,23,BEAM,S ,BYT ,MIN ~TRGDEF,25,BEAM,EPEL ,DIR ,MAX ~TRGDEF,30,BEAM,COMBS ,YBZM,MIN ~TRGDEF,35,BEAM,COMBEPEL,YBZM,MIN ! Combinations definition ! Combination 18: SELEC CFV [(2.0 or 3.0)*H1+(1.0 or 2.0)*H2+(1.0 or 1.0)*H4] ~CMBDEF ,18,SELECTVC,3,, 3 ~STSTDEF,18,1,LSTEP,2 ! H1: LS2 SB1 TM10 Q=1 (Span 1) ~STSTDEF,18,2,LSTEP,3 ! H2: LS3 SB3 TM30 Q=2 (Span 2) ~STSTDEF,18,3,LSTEP,8 ! H4: LS8 SB1 TM60 N=100 ~STSTCFT,18,1,3.00,2.00 ~STSTCFT,18,2,2.00,1.00 ~STSTCFT,18,3,1.00,1.00 ! Combine ~COMBINE !-------------------------------------------------------------------------------------- ! DATA CHECK !-------------------------------------------------------------------------------------- ! Data comparison number NComp = 10 NComp_ch = 0 ! Marix dim. *DIM,LABEL,CHAR,Ncomp,1 *DIM,VALUE,,Ncomp,3 *DIM,TOLER,,Ncomp,2 ! --------------------------------------------------------------------------------- ! Control tests ! --------------------------------------------------------------------------------- ! Test 1: ! - Hypothesis: Combination 18, Target 12 (MZAbs BEAM) ! - Point : Element 9 End J ! - Datum : MZ ! - Solution : 2*H1+2*H2+1*H4 = 6.4088235E+01 ! Test 2: ! - Hypothesis: Combination 18, Target 12 (MZAbs BEAM) ! - Point : Element 9 End J ! - Datum : FX ! - Solution : 2*H1+2*H2+1*H4 = 100 ! Test 3: ! - Hypothesis: Combination 18, Target 23 (SBYTmin BEAM) ! - Point : Element 5 End J ! - Datum : SBYT ! - Solution : 3*H1+1*H2+1*H4 = -21.713235 ! Test 4: ! - Hypothesis: Combination 18, Target 23 (SBYTmin BEAM) ! - Point : Element 5 End J ! - Datum : COMBEPELYTZM ! - Solution : 3*H1+1*H2+1*H4 = 9.4289216E-06 ! Test 5: ! - Hypothesis: Combination 18, Target 25 (EPELDIRmax BEAM) ! - Point : Element 15 End I ! - Datum : EPELDIR ! - Solution : 1*H4 = 1.6666667E-05 ! Test 6: ! - Hypothesis: Combination 18, Target 25 (EPELDIRmax BEAM) ! - Point : Element 15 End I ! - Datum : FX ! - Solution : 1*H4 = 100 ! Test 7: ! - Hypothesis: Combination 18, Target 30 (COMBSYBZMmin BEAM) ! - Point : Element 9 End I ! - Datum : COMBSYBZM ! - Solution : 3*H1+2*H2+1*H4 = -6.425000E+01 ! Test 8: ! - Hypothesis: Combination 18, Target 30 (COMBSYBZMmin BEAM) ! - Point : Element 9 End I ! - Datum : COMBEPELYTZM ! - Solution : 3*H1+2*H2+1*H4 = 5.475000E-05 ! Test 9: ! - Hypothesis: Combination 18, Target 35 (COMBEPELYBZMmin BEAM) ! - Point : Element 5 End J ! - Datum : COMBEPELYBZM ! - Solution : 2*H1+2*H2+1*H4 = 1.1452614E-05 ! Test 10: ! - Hypothesis: Combination 18, Target 35 (COMBEPELYBZMmin BEAM) ! - Point : Element 5 End J ! - Datum : FY ! - Solution : 2*H1+2*H2+1*H4 = 7.0856209E+00 ! --------------------------------------------------------------------------------- ! Point to combined data ~CMBDAT,2 ! Test 1: ~CFSET,,18,12 ETABLE,MZ_J,SMISC,12 *GET,VALUE(1,2),ELEM,9,ETAB,MZ_J VALUE(1,1)= 6.4088235E+01 ! Test 2: ~CFSET,,18,12 ETABLE,FX_J,SMISC,7 *GET,VALUE(2,2),ELEM,9,ETAB,FX_J VALUE(2,1)= 1.0000000E+02 ! Test 3: ~CFSET,,18,23 ETABLE,SBYT_J,LS,5 *GET,VALUE(3,2),ELEM,5,ETAB,SBYT_J VALUE(3,1)= -2.1713235E+01 ! Test 4: ~CFSET,,18,23 ETABLE,EPDIR_J,LEPEL,4 ETABLE,EPBYT_J,LEPEL,5 *GET,A,ELEM,5,ETAB,EPDIR_J *GET,B,ELEM,5,ETAB,EPBYT_J VALUE(4,2)=A+B VALUE(4,1)= 9.4289216E-06 ! Test 5: ~CFSET,,18,25 ETABLE,EPDIR_I,LEPEL,1 *GET,VALUE(5,2),ELEM,15,ETAB,EPDIR_I VALUE(5,1)= 1.6666667E-05 ! Test 6: ~CFSET,,18,25 ETABLE,FX_I,SMISC,1 *GET,VALUE(6,2),ELEM,15,ETAB,FX_I VALUE(6,1)= 1.0000000E+02 ! Test 7: ~CFSET,,18,30 ETABLE,SDIR_I,LS,1 ETABLE,SBYB_I,LS,3 *GET,A,ELEM,9,ETAB,SDIR_I *GET,B,ELEM,9,ETAB,SBYB_I VALUE(7,2)=A+B VALUE(7,1)= -6.425000E+01 ! Test 8: ~CFSET,,18,30 ETABLE,EPDIR_I,LEPEL,1 ETABLE,EPBYT_I,LEPEL,2 *GET,A,ELEM,9,ETAB,EPDIR_I *GET,B,ELEM,9,ETAB,EPBYT_I VALUE(8,2)=A+B VALUE(8,1)= 5.475000E-05 ! Test 9: ~CFSET,,18,35 ETABLE,EPDIR_J,LEPEL,4 ETABLE,EPBYB_J,LEPEL,6 *GET,A,ELEM,5,ETAB,EPDIR_J *GET,B,ELEM,5,ETAB,EPBYB_J VALUE(9,2)=A+B VALUE(9,1)= 1.1452614E-05 ! Test 10: ~CFSET,,18,35 ETABLE,FY_J,SMISC,8 *GET,VALUE(10,2),ELEM,5,ETAB,FY_J VALUE(10,1)= 7.0856209E+00 ! Labels ! --------------------------------------------------------------------------------- LABEL( 1) ='TEST1' LABEL( 2) ='TEST2' LABEL( 3) ='TEST3' LABEL( 4) ='TEST4' LABEL( 5) ='TEST5' LABEL( 6) ='TEST6' LABEL( 7) ='TEST7' LABEL( 8) ='TEST8' LABEL( 9) ='TEST9' LABEL(10) ='TEST10' ! Warning and error tolerances TOLER( 1, 1)= 1E-5 $ TOLER( 1, 2)= 1E-4 TOLER( 2, 1)= 1E-4 $ TOLER( 2, 2)= 1E-3 TOLER( 3, 1)= 1E-5 $ TOLER( 3, 2)= 1E-4 TOLER( 4, 1)= 1E-12 $ TOLER( 4, 2)= 1E-11 TOLER( 5, 1)= 1E-10 $ TOLER( 5, 2)= 1E-9 TOLER( 6, 1)= 1E-4 $ TOLER( 6, 2)= 1E-3 TOLER( 7, 1)= 1E-5 $ TOLER( 7, 2)= 1E-4 TOLER( 8, 1)= 1E-11 $ TOLER( 8, 2)= 1E-10 TOLER( 9, 1)= 1E-11 $ TOLER( 9, 2)= 1E-10 TOLER(10, 1)= 1E-6 $ TOLER(10, 2)= 1E-5 !-------------------------------------------------------------------------------------- ! Results comparison !-------------------------------------------------------------------------------------- COMPARA.MAC |
Results
| Label | Target | CivilFEM | Ratio | Tolerance |
| TEST1 | 64.088 | 64.088 | 1.000 | 0.0001 |
| TEST2 | 100 | 100 | 1.000 | 0.001 |
| TEST3 | -21.713 | -21.713 | 1.000 | 0.0001 |
| TEST4 | 9.4289e-006 | 9.4289e-006 | 1.000 | 1e-011 |
| TEST5 | 1.6667e-005 | 1.6667e-005 | 1.000 | 1e-009 |
| TEST6 | 100 | 100 | 1.000 | 0.001 |
| TEST7 | -64.25 | -64.25 | 1.000 | 0.0001 |
| TEST8 | 5.475e-005 | 5.475e-005 | 1.000 | 1e-010 |
| TEST9 | 1.1453e-005 | 1.1453e-005 | 1.000 | 1e-010 |
| TEST10 | 7.0856 | 7.0856 | 1.000 | 1e-005 |
Contains proprietary and confidential information of Ingeciber, S.A.

